Assessment of this restore: required repairs

Frame repair - once when towed. the tow hooks where hooked into the frame. The force had caused the frame to shred open about 4 inches.
Right side Left side
   
Both frames areas were welded and painted Original Door tag. All item match, color, trim, trans and rear
Left side lower Trunk side panel Right Side Lower truck panel
Carburator rebuild - Edelbrock Carb  
Valve stem seals replaced  
rubber valve stem seals had broke apart Also one of the push rods needed to be replaced.
Seats reupolster. Frames reenforced, new springs and upholstery  
picture shows the crack in the frame from the force of the back rest pushing on the frame for many years. These will be reinforced, better than orginal. steel bracket made to reenforce the cracked back rest area.
   

Last Day - Sold July 17 2020


https://youtu.be/Vm9NjrIKa-U